Chapter recap
Homeowners' Insurance Valuation
Valuation training and who may estimate replacement cost
✦
Valuation course: counts toward CE, taken once, before estimating or explaining coverage levels.
✦
Allowed: insurer staff, licensed P/C/personal lines broker-agents, contractors, architects, licensed appraisers.
✦
Unlicensed staff may not even explain coverage levels.
Documenting a replacement cost estimate
✦
Outline: producer documents replacement cost at original application.
✦
File: who prepared it, status, contact, method, documents used.
✦
Keep for the policy term or coverage period + 5 years; phone estimate → copy within 3 business days.
What a replacement cost estimate must include
✦
Include labor, materials, overhead, profit, demolition, debris removal, permits, plans.
✦
Never base it on land resale value or the loan balance.
Coinsurance: required insurance and partial losses
✦
Required = value × %; payment = carried ÷ required × loss.
✦
Coinsurance reduces payment; it never changes the limit.
✦
Check when the deductible applies and whether ACV is a floor.
Coinsurance on a total loss, and when values rise
✦
Total loss: payment capped at the limit, whatever the formula says.
✦
Meeting coinsurance does not raise the limit.
✦
Value is measured at the time of loss, so rising costs can create a penalty.
Actual cash value vs. replacement cost settlement in California
✦
ACV = replacement cost − fair physical depreciation, capped by the limit.
✦
RC with a rebuild requirement: ACV first, the difference after the work.
✦
At least 12 months to collect; 36 months in a state of emergency; 6-month extensions.
Guaranteed and extended replacement cost; ordinance or law coverage
✦
Extended RC: limit + stated % or amount.
✦
Guaranteed RC: no preset cap allowed under the label (§10102(e), (f)).
✦
Code upgrade (ordinance or law) pays added code and zoning costs.
Catastrophes and the cost of rebuilding: demand surge
✦
Demand surge: post-catastrophe jump in rebuilding costs.
✦
Prepare with higher limits or extended replacement cost.
✦
State of emergency: dwelling and other structures limits can be combined to rebuild the home (§10103.7(a)).
Earthquake is excluded, but fire following is covered
✦
Earthquake damage: excluded from homeowners and dwelling policies.
✦
Fire caused by or following an earthquake must be covered in California.
The California Earthquake Authority (CEA) vs. the competitive market
✦
CEA policies are sold and serviced only through participating insurers.
✦
Non-participating insurers still must offer earthquake coverage; stand-alone non-CEA policies exist.
✦
CEA disclosure: no CIGA, possible reduced or installment payments, surcharge up to 20%, limits such as no pools.
CEA policy structure: single limit, reduced coverage and the deductible
✦
One CSL for Coverages A and B; other limits are separate.
✦
Minimum offer may exclude pools, outbuildings, masonry fences, landscaping (§10089(a)(1)).
✦
Deductible = % of CSL, met only by dwelling losses; loss of use has none; it reduces the loss, not the limit.
CEA optional limits and retrofit discounts
✦
Options: loss of use up to $100,000; personal property $5,000 or $25,000; code upgrade to $20,000 or $30,000.
✦
No guaranteed or extended replacement cost in CEA policies.
✦
Retrofit discount: 5% by statute, more allowed; 25% for pre-1940 raised-foundation retrofits; none for slab homes.
CA
California Insurance Exam Prep
Bilingual practice for the California insurance license exams.
California Insurance Exam Prep is an independent study aid published by ORIGINAL HEART INC. It is not affiliated with, endorsed by, or connected to the California Department of Insurance (CDI) or PSI Services. All practice questions are original and written from the public CDI examination objectives and California law. They are not actual exam questions. Using this app does not guarantee that you will pass the licensing exam. Laws and exam content change; always check the current CDI Candidate Information Bulletin.
© 2026 ORIGINAL HEART INC